
Sep 23, 2026
What is a change order in construction?
A construction change order formally changes a contract's scope, price, or schedule. Learn what triggers one, who approves it, and the risks of delay.
Blog
Industry perspective, product updates, and practical guidance for construction teams evaluating and deploying AI.

Sep 23, 2026
A construction change order formally changes a contract's scope, price, or schedule. Learn what triggers one, who approves it, and the risks of delay.

Sep 15, 2026
TrunkCoordinate automates construction drawing coordination across architectural, structural, and MEP sheets to catch conflicts before they become field rework.

Sep 11, 2026
A construction system of record stores documents. A system of action connects them so teams can review, price, and act on change. Here's what that gap costs.

Sep 8, 2026
A primer on how AI reads, connects, reviews, and generates the documents on a construction project — where the tech is real, where it's not.

Sep 1, 2026
A plain-English construction glossary of the 20 terms that show up on every RFI, submittal, and change order, with links to detailed guides.

Aug 28, 2026
Before construction AI can answer questions or run agents reliably, it has to pre-process the project — classify documents, read drawings, and build a knowledge graph. Skip it and you get guesses or expensive re-reads.

Aug 27, 2026
Bid leveling software helps GCs compare subcontractor bids on equal terms by normalizing formats, surfacing exclusions, and cutting the 4–8 hours estimators spend per package by hand.

Aug 27, 2026
Most GC submittal software logs and routes packages — it doesn't compare them to the spec. Here's how Procore, Autodesk Forma, Bluebeam, and AI-first tools like TrunkSubmittal actually differ.

Aug 26, 2026
Download a free construction RFI template and see what a well-written RFI includes — fields, common mistakes, and a step-by-step writing guide.

Aug 25, 2026
Construction specifications (specs) define quality, performance, and installation standards. Here's how CSI MasterFormat organizes them, what the three parts of a section mean, and which divisions fail compliance most often.

Aug 21, 2026
A submittal in construction proves that the product or method a subcontractor plans to install matches the specs before it's ordered or built. Learn the types, review chain, and why so many get rejected.

Aug 21, 2026
An RFI in construction is a formal written question to the design team when drawings or specs don't give the field enough information to build. Here's how RFIs work, what fields they need, and how long responses take.